Hi everyone! We're hard at work trying to keep our community clean, so if you see any spam, please report it here and we'll review ASAP!  Thanks a million!
12,270 Users Online
  • 640,129,772 Downloads
  • 1,696,349 Wallpapers
  • 1,565,068 Members
  • 12,971,712 Votes
  • 5,965,287 Favorites

dave112
Online Now
Login to Become a Fan
 
ProfileWallpapers (1)Favorites (0)Journal (40)DiscussionContact Member
Journal for dave112Journal for dave112
Jan
24
Happy
Here is the instruction on how to remove and install exhaust pipe for ISUZU 4JJ1 enigne Euro 4 N series.



Related Contents:

2023 ISUZU E-IDSS Diagnostics for Heavy Duty Machine
2023 2019 Isuzu G-IDSS Export Diagnostic Software Free Download
ISUZU IDSS MX2-T Adapter

Removal

Remove the tail pipe.
1.Remove the clamps and tail pipe.
2. Remove the silencer.
3. Remove the front exhaust pipe B.
4. Remove the exhaust brake.Remove the vacuum hose and the exhaust brake assembly.
5. Remove the front exhaust pipe A.
6.Remove the clamp, and then remove the front pipe.


Inspection
1. Externally inspect the exhaust pipe components.
●Damage caused by heat from the body panel or vibrations can cause exhaust gas to enter the cabin. Be careful.
●Inspect for loose or damaged connections and exhaust gas leaks.
●Inspect the clamp and rubber for degradation, cracks or damage.
●Inspect the pipe or silencer for dents, or cracks caused by corrosion. If damaged, repair or replace them.


Installation
NOTE:
Vibrations and looseness of the exhaust system can be caused by miss-positioning when assembling. Temporarily install the bolts while all the components are positioned. After positioning is completed, tighten them from the engine side to the tail pipe side.


●Do not reuse the removed gasket or nut.
1. Install the front exhaust pipe A.
Tightening torque:
67 N.m (6.8 kg.m/ 49 Ib.t)


NOTE:
Uniformly tighten the front exhaust pipe so that there is no gas leak.

2. Install the exhaust brake assembly and the front exhaust pipe B.

●Attach the vacuum hose.
Tightening torque:
27 N-m (2.8 kg.m/ 20 Ib.ft)
3. Install the silencer to the front pipe B.
Tightening torque:
22 N.m (2.2 kg-m/ 16 Ib-ft)

4. Connect the tail pipe.
●Tighten the clamp.
Tightening torque: 22 N-m (2.2 kg-m/ 16 Ib.f) .

●Start the engine after assembling each part,and check for gas leakage from each joint and for vibration.
https://www.car-auto-repair.com
Times Viewed: 27Bookmark and Share
0 responses have been posted to this journal entry. Post Your Response!
Advertisement
Previous Journal Entry
Next Journal Entry

Recently Spotted Members


No members found. Be the first.